Quality-first execution
Supers verify plumb, level, and manufacturer specs at each trade handoff so finished rooms feel solid underfoot and quiet on windy nights.
iphonego Homes connects skilled roofers, remodelers, and licensed trades for kitchens, baths, structural repairs, and finishing work. Tell us about your project and we will outline scope, permits, and a realistic schedule before demo day.
Supers verify plumb, level, and manufacturer specs at each trade handoff so finished rooms feel solid underfoot and quiet on windy nights.
Electricians, plumbers, and roofers carry active credentials matched to the work they perform, with insurance certificates available before mobilization.
Installations include clear warranty terms and maintenance notes so you know how to protect tile, roofing, and newly routed plumbing.
Every durable renovation begins with an honest walkthrough of how your household uses each room. We note traffic patterns, moisture exposure, and the condition of hidden layers such as sheathing, subfloor, and old wiring before we recommend scope. That upfront clarity prevents surprise change orders when walls open and helps you prioritize work that protects structure first and cosmetics second.
Material selection should match maintenance habits. A family that cooks daily needs heat-tolerant counters and ventilation that clears grease; a home with pets benefits from scratch-resistant flooring and washable wall finishes. We bring sample boards to compare sheen, grout width, and trim profiles so decisions happen in your lighting—not under showroom spots alone.
Roof work is more than shingles visible from the curb. We inspect decking, drip edge, ice barriers at eaves, and attic intake so the assembly sheds water and breathes. When flashing around chimneys or skylights fails, stains appear far from the leak source; our crews map pathways and replace compromised metal rather than patching over rust.
Storm damage often exposes whether prior repairs were cosmetic. We document lifted tabs, granule loss, and soft spots, then explain repair versus replacement with photos you can share with insurers or future buyers. Ventilation upgrades paired with new roofing reduce attic heat that ages asphalt from underneath.
Layout drives satisfaction more than cabinet brand. We measure clearances for drawers, dishwasher swing, and refrigerator doors, then adjust island depth so walkways stay open when two people prep meals. Plumbing moves are planned before demo so shutoffs remain accessible after cabinets install.
Lighting layers matter: task strips under uppers, ambient cans on dimmers, and a focal fixture over islands. We coordinate rough-in with electricians before drywall closes, and we verify GFCI protection anywhere water and outlets meet code expectations for wet zones.
Tile looks effortless when waterproofing is meticulous. We flood-test pans, seal niches, and use cement board where steam concentrates. Fan capacity is matched to room volume so mirrors clear quickly; duct runs are kept short and insulated to limit condensation in cold seasons.
Fixture heights follow the people using them. We confirm towel bar reach, shower valve placement, and vanity knee space for seated grooming. Glass enclosures get slope on curbs so water returns to drains instead of pooling on floors outside the stall.
Remodeling succeeds when trades hand off clean work. Framers leave straight walls for drywall; plumbers pressure-test before insulation covers pipes; painters seal cut lines only after final hardware is fitted. Our supers maintain a live schedule so electricians are not waiting on incomplete framing and tile setters are not cutting around unset cabinets.
Dust control protects HVAC systems. We isolate work zones with zipper doors, run HEPA scrubbers on sanding days, and change return filters after heavy demolition. That discipline keeps living areas usable when only part of the home is under construction.
Small jobs receive the same documentation as large additions. A leaking supply line gets a photo of the repaired coupling; a sagging deck board includes notes on joist condition. Homeowners gain a paper trail that simplifies future service calls because we know what was replaced and when.
We stock common fasteners, sealants, and trim profiles on service trucks to finish same-day whenever safe. When a repair uncovers deeper rot, we pause, explain options, and provide a written path forward before expanding scope.
From storm-ready roofing to detail painting, our teams coordinate scopes that keep your home sealed, powered, and comfortable.


Layout changes, additions, and open-concept conversions.

Repipes, fixture upgrades, and leak diagnostics.

Panels, lighting plans, and safety retrofits.

Hardwood, tile, and resilient surfaces with sound prep.

Surface repair, priming, and low-VOC finishes.
Daily photo logs keep you informed when you cannot be on site.
Code-aware supers catch conflicts before drywall hides them.
Material staging reduces damage to existing floors and landscaping.
Single schedule aligns roofers, plumbers, and painters without gaps.
Finished kitchens, dry basements, and watertight roofs from recent client partnerships.






Our roof was replaced in three days with magnetic nail sweep each evening. The attic fan they added finally stops the summer heat from baking the upstairs hall.— Mara K., whole-roof replacement
The kitchen remodel kept our fridge online until swap day. Drawers clear the dishwasher, and the tile backsplash lines up with window trim perfectly.— Jonas P., kitchen remodel
Bathroom waterproofing was documented with photos before tile went up. Exhaust clears the mirror in minutes, and the curb slope keeps water inside the shower.— Elise R., master bath renovation

Project manager

Roofing lead

Electrician

Plumber

Lead carpenter

Painter
We photograph existing conditions, verify measurements, and confirm utility locations before ordering long-lead cabinets or windows.
Selections for tile, roofing color, and hardware happen with samples viewed in your rooms under natural light.
Trade sequence keeps critical path tight: rough mechanicals, inspections, insulation, drywall, finishes, and punch-list walks with your super.
Daily cleanup and locked storage protect materials overnight on active job sites.
We provide warranty packets, fan/filter reminders, and care instructions for stone, grout, and coated roofing.
Final invoices reconcile change orders with signed approvals attached for your records.
From $48
From $96
From $160
Detailed line-item proposals appear on the pricing page; amounts scale with scope after site visit.
Timelines depend on layout changes, inspection cycles, and material lead times. A bath refresh with like-for-like plumbing often finishes in several weeks, while kitchens with moved utilities may need longer to accommodate rough inspections and countertop templating. We publish a Gantt-style schedule with float days for weather on exterior portions tied to the same contract.
When code requires permits for load-bearing changes, panel upgrades, or vent alterations, we prepare drawings and schedule inspections. Cosmetic swaps that do not alter systems may not need filings; we tell you which category your scope falls into before work begins so there are no surprises at final walkthrough.
Walk every affected room, note ceiling heights, attic access, and visible stains that hint at hidden damage. Share inspiration photos and must-have fixtures so we can flag lead times early. After the visit, expect a written range with assumptions listed, plus optional alternates for roofing tiers or cabinet lines.
Many clients stay in place with dust barriers and temporary kitchen setups. Roofing days are noisy; we suggest parking adjustments and pet plans. For extensive whole-home work, temporary relocation may be more comfortable; we sequence phases to keep at least one bathroom operational whenever possible.



Share your roofing, remodeling, or repair goals and we will respond with next steps within three business days.
Start your quote